Video:
- Temporarily installed a 5000 lumen project on the ledge above door five. This projector had a long throw lens and I focused it on the baptistry wall, just for some more stage color. It looked pretty cool; I guess that it is called architectural projection. Have a look at the pictures linked below. I did get one complaint from the choir – that it shined in their eyes being that it was mounted right below the confidence monitor.
Audio:
- Installed the cable for the switch to the Digital console. We planned on pulling it through the conduit under the floor but it was full of water. Ended up bringing in Vincent and his crew to walk the iron.
Here is a link to this Sundays pictures